RGA Engineering y Projects

  • Client:  Polifilm de Venezuela, SA
  • Inverted H/H:  24
  • Location:  La Victoria, Venezuela.
After the successful execution of the wind extractors in Polifilm sheds 8 and 9 ( see project ), RGA was required to design and install the integral Polifilm ventilation system, being carried out in phase 1, the wind extraction system in warehouse 5 of the plant. Being this the newest area of ​​the plant with an elevation of 14 meters high, and its highest point, the arrangement was designed to serve as a chimney effect and allow the discharge of hot air from a large part of the enclosure. 10 pieces of 30-inch diameter equipment were installed , obtaining improvements practically immediately after they were put into operation. The work can be seen from the  Autopista Regional del Centro , at the height of Victoria in the Caracas-Valencia direction, with a perpetual movement 24 hours a day.